Enterprise Mobile App Development · Singapore

Enterprise mobile app development

Namtech Pte Ltd, a Singapore AI transformation consultancy, builds iOS and Android apps from a single React Native codebase, from SGD 18,000 with delivery in 12–32 weeks. Every app includes a backend API, user authentication, push notifications, App Store and Google Play submission, and full source code ownership.

Starting investment

SGD 18,000

Fixed price, excl. GST

Delivery timeline

12–32 weeks

Milestone-governed

Cross-platform

iOS + Android

Single codebase

The problem

Why mobile projects fail to deliver

Mobile app projects usually fail because of process rather than technology: undefined scope, weak architecture decisions and absent governance set up failure before any code is written. These are the five gaps we design out.

An app that passes demo is not one that scales under load.

  1. 01

    Scope creep and undefined requirements

    Mobile projects without formal feature lists, approved wireframes, and documented acceptance criteria expand continuously, consuming budget before a functional product exists.

  2. 02

    Scalability architecture failures

    Apps built without a scalable backend architecture collapse under user growth, require costly re-engineering, and create downtime events that damage brand credibility at critical moments.

  3. 03

    App Store rejection loops

    Submissions rejected due to unchecked privacy policy requirements, inadequate data handling disclosures, or missing compliance documentation add weeks of unplanned remediation time.

  4. 04

    Poor cross-platform performance

    Apps built with unsuitable frameworks or desktop-first logic create degraded mobile experiences characterised by janky animations, slow load times, and battery drain.

  5. 05

    No post-launch ownership

    Apps delivered without source code access, admin documentation, or push notification infrastructure create permanent vendor dependency for all future updates and campaigns.

Delivery framework

Four-phase mobile app delivery

Every mobile app moves through four milestone-gated phases: scope definition, UX architecture, sprint-based development, and testing and store submission. Scope is locked before development begins, and no phase starts without written client approval.

  1. Phase 01

    Strategy & Scope Definition

    Feature list, user journeys & technical specification

    Formal requirements gathering documenting all screens, user journeys, backend integrations, and platform requirements. Technical architecture defined and signed off before design commences.

    Timing
    Weeks 1–3
    Output
    Technical specification & feature register
  2. Phase 02

    UX Architecture

    Information architecture, wireframes & design system

    Structured UX design beginning with information architecture, navigation flow, and low-fidelity wireframes. Mobile-first component library and high-fidelity screen designs signed off before any development commences.

    Timing
    Weeks 3–6
    Output
    Approved design system & all screen designs
  3. Phase 03

    Structured Development

    Sprint-based build with milestone approvals

    Development executed in defined 2-week sprints with client review at each milestone. Backend API, authentication, push notifications, and all integrations built within the agreed scope. No additions without formal change requests.

    Timing
    Weeks 6–20
    Output
    Staged application on TestFlight / Play Console
  4. Phase 04

    Testing & Deployment

    QA, store submission & handover documentation

    Structured QA across iOS and Android covering all defined user flows, device compatibility matrix, and performance benchmarks. App Store and Google Play submission with compliance documentation. Full source code and admin handover.

    Timing
    Weeks 20–24
    Output
    Published app & handover documentation pack

Written client approval required before each phase commences.

Phase weeks are indicative for a typical project. Committed package timelines: Structured Business App 12–24 weeks, Enterprise / Platform App 16–32 weeks.

What's included

Every package includes

Both mobile app packages include the same eight deliverables as standard, from technical specification to store submission and source code handover.

01

Technical Specification

Complete feature register, screen inventory, user flow diagrams, and API contracts produced before development begins.

02

Mobile UX Design System

Custom component library, iOS and Android design guidelines compliance, and approved high-fidelity screens for all defined views.

03

Backend API Development

Scalable REST API, database architecture, user authentication, push notification infrastructure, and third-party integration layer.

04

Security Architecture

Secure token-based authentication, encrypted local storage, certificate pinning, and session management built to OWASP Mobile Security standards.

05

App Store Submission

Full App Store and Google Play submission including metadata, screenshots, privacy policy, data handling disclosures, and compliance review.

06

QA & Device Testing

Structured testing across iOS and Android on a defined device matrix covering all user flows, edge cases, and performance benchmarks.

07

Source Code & IP Handover

Full source code ownership transferred to the client. Complete repository access, no proprietary lock-in, and full deployment pipeline documentation.

08

Admin & Push Notification Setup

Push notification infrastructure, admin dashboard access, crash reporting configuration, and role-based administrator training.

Engagement governance

How we govern your build

Mobile development is prone to scope expansion, timeline drift and app store delays. Each engagement runs under six written controls that prevent them.

01

Defined Screen & Feature Scope

All app screens and features are formally documented and signed off before development. No screen is built without a corresponding approved design and written specification.

02

Formal Change Request Process

Any feature addition or modification outside the agreed scope requires a formal change request with documented cost and timeline impact prior to execution.

03

No Unlimited Revision Cycles

Design and development revision cycles are defined per phase in the engagement agreement. Additional revisions are separately scoped and quoted.

04

Secure Backend Integration Standards

All backend integrations (authentication, payments, third-party APIs) are defined in the technical specification and built to agreed security standards.

05

IP and Source Code Ownership

All custom-developed code is the intellectual property of the client upon final payment. Namtech retains no licence over deliverables after project completion.

06

Milestone Payment Structure

70% at project commencement, 30% upon App Store / Google Play approval and client sign-off. No payment milestones tied to third-party review timelines.

Engagement packages

Fixed-scope mobile app packages

Namtech offers two mobile app packages: Structured Business App (up to 15 screens, SGD 18,000, 12–24 weeks) and Enterprise / Platform App (up to 30 screens, from SGD 35,000, 16–32 weeks). Prices are in SGD excluding GST.

Most selected

Structured Business App · Tier 1

For businesses requiring a defined mobile application (customer portals, internal operational tools, service booking platforms, or loyalty apps) with a fixed feature set.

SGD18,000

12–24 weeks · Up to 15 screens

  • iOS and Android (React Native)
  • Up to 15 defined screens
  • User authentication & profile management
  • Push notification infrastructure
  • Backend API and database setup
  • 2 third-party integrations
  • App Store & Google Play submission
  • 2 weeks post-launch support
Book Mobile Strategy Consultation

Terms Fixed investment · No hidden costs · 70% upfront · 30% on store approval

Not included Multi-tenant / SaaS architecture

Terms Starting investment · Scope locked at start · 70% upfront · 30% on store approval

Custom scope Beyond 30 screens and native device hardware integrations (camera, biometrics, NFC) are scoped and quoted separately after discovery.

Package comparison

ItemStructured Business AppEnterprise / Platform App
InvestmentSGD 18,000From SGD 35,000
Timeline12–24 weeks16–32 weeks
ScreensUp to 15 screensUp to 30 screens
Multi-tenant / multi-role architectureNot includedIncluded
Third-party integrations2Up to 5
Offline mode & local data syncNot includedIncluded
Post-launch support2 weeks4 weeks
Payment70% upfront · 30% on store approval70% upfront · 30% on store approval

All engagements are subject to a scoping call before the proposal. Screen scope beyond package limits is quoted separately. Pricing in SGD excluding GST.

Why Namtech

Why Singapore enterprises choose Namtech

Six working commitments that apply to every Namtech mobile app project.

01

Singapore Technical Oversight

Projects are managed and technically overseen from Singapore, with a named project lead, clear escalation paths and no offshore development handoffs without prior client disclosure.

02

Cross-Domain Integration Expertise

Namtech also delivers ERP, e-commerce and web application projects, which helps when a mobile app must connect to your existing business systems.

03

React Native Cross-Platform Delivery

Namtech builds mobile apps in React Native: one codebase for both iOS and Android, which keeps features consistent across platforms and avoids paying for two separate builds.

04

Sprint Governance Framework

Development runs in 2-week sprints with client review at each milestone.

05

Fixed-Price Commercial Discipline

Engagements are fixed-scope and fixed-cost; changes go through a written change request with cost and timeline impact.

06

Full IP and Source Code Ownership

Clients own all custom-developed code from final payment, with full repository access, with no proprietary SDKs and no platform lock-in.

FAQ

Questions buyers ask

How much does mobile app development cost in Singapore with Namtech?

Structured Business App (up to 15 screens) is SGD 18,000. Enterprise / Platform App (up to 30 screens, multi-tenant or multi-role) starts from SGD 35,000. Prices are in SGD excluding GST.

How long does it take to build a mobile app?

Structured Business App takes 12–24 weeks and Enterprise / Platform App takes 16–32 weeks. Development runs in 2-week sprints with client review at each milestone.

Do you build separate iOS and Android apps?

No. Apps are built in React Native, so a single codebase runs on both iOS and Android with consistent features across platforms.

Is App Store and Google Play submission included?

Yes. Both packages include App Store and Google Play submission with metadata, screenshots, privacy policy, data handling disclosures and compliance review.

How are payments structured?

Payment is 70% at project commencement and 30% on App Store / Google Play approval and client sign-off.

Mobile strategy consultation

Engineer your mobile platform the right way.

Book a 30-minute mobile strategy consultation. We assess your product requirements and send a fixed-scope proposal within 3 business days. No obligation.